EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Duckie
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (188)
Research
Workshop
- (2)
Empennage
- (2)
Fuselage
- (18)
Firewall
- (7)
Tail Feathers
Wings
- (2)
Controls
- (27)
Avionics
- (21)
Lighting
- (2)
Instrument Panel
- (11)
Landing Gear
- (12)
Engine
- (40)
Propeller
- (6)
Fuel System
- (11)
-
Calibrated fuel sensors
-
Fix soft spot on...
-
Installed fuel lines
-
Installed bottom tap
-
Closing main fuel tank
-
Fiberglassed in...
-
Molded new bottom...
-
Cut out old fuel...
-
Designed new fuel...
-
Floxed in header...
-
Installed main tank...
Interior Finish
- (7)
Paint / Decals
- (10)
Inspection
- (10)
Tools
Builder Name:
Robert Schmid
-
Project:
Quickie - Q2
-
VIEW REPORTS
Total Hours:
1219
Start/Last Date:
Apr 29, 2022 - Aug 31, 2023
Engine:
O-200
Propeller:
Catto
Panel:
Falken Avionics, Uavionics AV-30, BendixKing AP, iPads
Friendly URL:
https://eaabuilderslog.org?s=Duckie
Home or Last Project Picture
Nov 07, 2022
Installed fuel lines
- (4 hours)
Category: Fuel System
Pickup to pump with flex
Pump to firewall with hard
Firewall to return in header with hard
C6A4A22C-3982-45B2-9F02-1980B39B4D75.jpeg
81C3E185-BCE1-4129-9257-CF2E4E0B4EFB.jpeg
CE251066-1FC5-4EA7-8449-7EAD70A59504.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.